All Blog Posts
September 8, 2026
See how automated lead forming equipment coordinates mechanical lead preparation with sleeve insertion, two-stage heat shrinking, cooling, and unloading.
September 8, 2026
See how an NTC sensor automated production line uses line boards, encapsulation frames, potting fixtures, and testing across a 20,000-piece daily target.
September 8, 2026
See how an Automotive NTC assembly line connects welding, 120 frames, turnover carts, ovens, and 25°C/85°C testing for an 8,000-piece shift target.
September 8, 2026
See how automated assembly equipment for wire harness and sensor manufacturing uses CCD-guided robots, return flow, tape fixing, and wire alignment.
September 8, 2026
See how an AOI and Lead Forming cell integrates ferrite-bead insertion, glue dispensing, CCD inspection, and nonstop carrier handling while reducing staffing from 3 operators to 1.
September 4, 2026
See how lead forming equipment uses two machines with three forming groups each to handle six lead shapes through shared feeding, transfer, and multi-stage forming.







