All Blog Posts

September 9, 2026

See how an automated production system connects wire processing, soldering, cleaning, encapsulation, shell assembly, and database-backed resistance testing.

September 9, 2026

See how we matched 1,800-2,000 pcs/hour front-end flow with faster encapsulation and testing, using frames, carts, and fixtures for a 20,000 pcs/day NTC line.

September 9, 2026

See how automated soldering equipment processes only the terminal zone of wires up to 1.5 m long using board transfer, square pressing, and welding.

September 8, 2026

See how automated lead forming equipment coordinates mechanical lead preparation with sleeve insertion, two-stage heat shrinking, cooling, and unloading.

September 8, 2026

See how lead forming systems keep three feeding and forming paths independent while one four-axis robot shares downstream handling in a compact cell.

September 8, 2026

See how automated fastening systems use a six-axis robot, vision correction, two screw feeders, and existing conveyor flow for 1.9 m battery products.